Harris County Flood Control District home pageAbout the districtPrograms and projectsLearning centerMaps and exhibitsFrequently asked questionsDownloadsLinksNews and media events
Your opinion matters. Take our quick survey.
Capital Improvement Program
BMPbase - Regional BMP Database
Floodplain Reference Marks Tool
LOMR Delegation Program
Major Projects
General Info
Armand Bayou
Brays Bayou
Carpenters Restoration
Clear Creek
Clear Creek - 2nd Outlet Channel
Cypress Creek
Greens Bayou
Halls Bayou
Hunting Bayou
Memorial Park Demonstration Project
Poor Farm Ditch
Sims Bayou
Terry Hershey Park Surveying Contract
Vogel Creek
W129-00-00
White Oak Bayou
Major Studies
Geographic Information Systems
Greens Bayou Wetlands Mitigation Bank
Model and Map Management System
Property Acquisition
Property Management
Stormwater Quality
Trails and Our Bayous
Tree Planting Program
TS-Allison Recovery Project
Vegetation Management
Watershed Environmental
Baseline Program

W129-00-00 Channel Enclosure Project

NOTE: Some of the documents are stored as Adobe Acrobat .PDF files, so they will print properly on any computer printer. You will need to install the free Adobe Acrobat Reader software on your computer before you can open these documents.
 
 
Construction Update - W129-00-00 Channel Enclosure Project

Feb 21st, 2013

 Westheimer Lane Closure Alternate Route Map.jpg

On March 3, 2013, the Harris County Flood Control District will close two lanes of the Westheimer Road Bridge located just east of Mid Lane inside West Loop 610 in the Galleria area. Traffic will be limited to one lane in each direction for up to one month while the 50-year-old bridge is demolished and replaced.

If their ultimate destination is not in the area, motorists are encouraged to avoid the area while the bridge is under construction or to use an alternate route. Possible alternate routes include West Loop 610, Memorial Drive, San Felipe Street, Richmond Avenue or Kirby Drive. Signs announcing the lane closure dates have been installed in the area. Motorists are encouraged to be alert, to pay attention to all posted street and lane closures and to take an alternate route.

The Westheimer bridge replacement is part of the Flood Control District's $13.2 million W129-00-00 Channel Enclosure Project, which is rebuilding and enclosing the poorly functioning drainage channel formally identified as HCFCD Unit W129-00-00. The work spans W129-00-00 from San Felipe to Richmond and includes enclosing the drainage channel with dual 12-foot by 10-foot reinforced concrete box culverts and replacing the bridges at Westheimer and San Felipe. The City of Houston is contributing funds to the bridge projects.

The San Felipe bridge is expected to be replaced in summer 2013. During this time, the bridge will be closed to all traffic for up to two weeks. The Flood Control District will also establish alternate routes that will aid in the flow of traffic during that bridge project. The Westheimer and San Felipe schedules are subject to change due to construction or weather issues.

For more information about the project, visit the W129-00-00 Channel Enclosure Project webpage at www.hcfcd.org/W129. If you have questions or comments, please call the Flood Control District's Project and Study Information Line, which is monitored daily, at 713-684-4040.


W129-00-00 Channel Enclosure Project

To receive news and updates on the W129-00-00 Channel Enclosure Project, sign up.
  W129-00-00 Channel Enclosure Project hotline – (713) 684-4040  
Harris County Flood Control District
Footer navigation Home About the District Programs and Projects Learning Center Maps and Exhibits Frequently Asked Questions Downloads Links News and Events Contact Us Employment Site map Terms, Conditions and Notices Privacy Policy Accessibility Search