Harris County Flood Control District home pageAbout the districtPrograms and projectsLearning centerMaps and exhibitsFrequently asked questionsDownloadsLinksNews and media events
Your opinion matters. Take our quick survey.
Capital Improvement Program
BMPbase - Regional BMP Database
Floodplain Reference Marks Tool
LOMR Delegation Program
Major Projects
General Info
Armand Bayou
Brays Bayou
Carpenters Restoration
Clear Creek
Clear Creek - 2nd Outlet Channel
Cypress Creek
Greens Bayou
Halls Bayou
Hunting Bayou
Memorial Park Demonstration Project
Poor Farm Ditch
Sims Bayou
Terry Hershey Park Surveying Contract
Vogel Creek
W129-00-00
White Oak Bayou
Major Studies
Geographic Information Systems
Greens Bayou Wetlands Mitigation Bank
Model and Map Management System
Property Acquisition
Property Management
Stormwater Quality
Trails and Our Bayous
Tree Planting Program
TS-Allison Recovery Project
Vegetation Management
Watershed Environmental
Baseline Program

W129-00-00 Channel Enclosure Project

NOTE: Some of the documents are stored as Adobe Acrobat .PDF files, so they will print properly on any computer printer. You will need to install the free Adobe Acrobat Reader software on your computer before you can open these documents.
 
 
Construction Update - W129-00-00 Conveyance Improvements Project

Feb 7th, 2012

 W129-00-00 Project Area Map.jpg

Bridges at San Felipe Street and Westheimer Road that cross a drainage ditch formally identified as W129-00-00 in the Galleria area are expected to be completely or partially closed temporarily in spring 2012, weather and construction schedule permitting. Changes in the construction schedule have delayed the expected bridge closures from previously published dates.

The Harris County Flood Control District will establish detour routes that will aid in the flow of traffic during the bridge projects and will provide an advisory to area residents, the media and other interested parties closer to the time of bridge construction.

The bridges will be reconstructed as part of the Flood Control District's W129-00-00 Conveyance Improvements Project. (See attached project area map.) The bridge reconstruction projects will require all lanes on the San Felipe bridge to be closed for up to two weeks and traffic flow on the Westheimer bridge to be limited to one lane in each direction for up to a month.

The project is rebuilding and enclosing a section of the drainage ditch, which runs adjacent to the Union Pacific Railroad tracks just inside West Loop 610.

In August 2011, the Flood Control District began this $13.2 million capital improvement project to improve the flow of stormwater. This particular phase of the project spans from San Felipe Street to Richmond Avenue and includes the demolition and replacement of the two 50-year-old bridges.

For more information about the project, visit the W129-00-00 Conveyance Improvements Project webpage at www.hcfcd.org/W129. If you have questions or comments, please call the Flood Control District's Project and Study Information Line, which is monitored daily, at 713-684-4040.


W129-00-00 Channel Enclosure Project

To receive news and updates on the W129-00-00 Channel Enclosure Project, sign up.
  W129-00-00 Channel Enclosure Project hotline – (713) 684-4040  
Harris County Flood Control District
Footer navigation Home About the District Programs and Projects Learning Center Maps and Exhibits Frequently Asked Questions Downloads Links News and Events Contact Us Employment Site map Terms, Conditions and Notices Privacy Policy Accessibility Search