Harris County Flood Control District home pageAbout the districtPrograms and projectsLearning centerMaps and exhibitsFrequently asked questionsDownloadsLinksNews and media events
Your opinion matters. Take our quick survey.
Capital Improvement Program
BMPbase - Regional BMP Database
Floodplain Reference Marks Tool
LOMR Delegation Program
Major Projects
General Info
Armand Bayou
Brays Bayou
Carpenters Restoration
Clear Creek
Clear Creek - 2nd Outlet Channel
Cypress Creek
Greens Bayou
Halls Bayou
Hunting Bayou
Memorial Park Demonstration Project
Poor Farm Ditch
Sims Bayou
Terry Hershey Park Surveying Contract
Vogel Creek
W129-00-00
White Oak Bayou
Major Studies
Geographic Information Systems
Greens Bayou Wetlands Mitigation Bank
Model and Map Management System
Property Acquisition
Property Management
Stormwater Quality
Trails and Our Bayous
Tree Planting Program
TS-Allison Recovery Project
Vegetation Management
Watershed Environmental
Baseline Program

W129-00-00 Channel Enclosure Project

NOTE: Some of the documents are stored as Adobe Acrobat .PDF files, so they will print properly on any computer printer. You will need to install the free Adobe Acrobat Reader software on your computer before you can open these documents.
 
 
Construction Update - W129-00-00 Channel Enclosure Project

Feb 19th, 2013

 W129-00-00 Project Area Map.jpg

Bridges at Westheimer Road and San Felipe Street that cross a drainage channel formally identified as HCFCD Unit W129-00-00 will require traffic detours while they are reconstructed as part of the Harris County Flood Control District's W129-00-00 Channel Enclosure Project. Changes in the construction schedule have delayed the expected detours from previously published dates. The bridges will not be under construction at the same time.

Work on the Westheimer bridge is expected to begin in March 2013. The bridge reconstruction project will require traffic flow on the Westheimer bridge to be limited to one lane in each direction for up to a month. The Flood Control District will communicate more information about the Westheimer bridge closure as it is available.

Work on the San Felipe bridge is expected to begin in summer 2013 and all lanes will be closed for up to two weeks. Both schedules are subject to change due to construction or weather issues.

If their ultimate destination is not in the area, motorists are encouraged to avoid the area while the bridges are under construction or to use a detour route. Signs announcing the lane closure dates will be installed in the area prior to the closures. Motorists are encouraged to be alert, to pay attention to all posted street and lane closures and to follow traffic detours.

The Flood Control District's $13.2 million W129-00-00 Channel Enclosure Project is rebuilding and enclosing the poorly functioning drainage channel. Started in August 2011, the project spans W129-00-00 from San Felipe to Richmond and includes enclosing the drainage channel with dual 12-foot by 10-foot reinforced concrete box culverts and replacing the bridges at Westheimer and San Felipe. The City of Houston is contributing funds to the bridge projects.

For more information about the project, visit the W129-00-00 Channel Enclosure Project webpage at www.hcfcd.org/W129. If you have questions or comments, please call the Flood Control District's Project and Study Information Line, which is monitored daily, at 713-684-4040.


W129-00-00 Channel Enclosure Project

To receive news and updates on the W129-00-00 Channel Enclosure Project, sign up.
  W129-00-00 Channel Enclosure Project hotline – (713) 684-4040  
Harris County Flood Control District
Footer navigation Home About the District Programs and Projects Learning Center Maps and Exhibits Frequently Asked Questions Downloads Links News and Events Contact Us Employment Site map Terms, Conditions and Notices Privacy Policy Accessibility Search